Framework RK-13v1.0July 2026Executive Brief
Certification Pathway Navigator
47 certifications across 12 markets. Each has prerequisites, timelines, and costs. Navigate them in the right order or pay for re-testing.
Updated July 2026 · 5 Figures · For B2B Buyers & OEM Partners
Figure 1: 12-market certification map — which certifications each market requires and which are mutually recognized.
Figure 2: Optimal certification pathway — test once, certify many. MRA leverage saves $15K-40K.
Figure 3: Cost and timeline matrix — each certification’s cost, duration, and dependency chain.
Figure 4: Six certification strategy rules — from CB Scheme sequencing to pre-compliance testing.
Figure 5: Multi-market launch — parallel testing strategy via CB Scheme reduced total certification time from 22 weeks to 14 weeks.
Download the Full RK-13 Certification Pathway Navigator Report (PDF)
Includes the complete certification database, cost matrix, and the critical-path testing schedule template.
Download Report →
Free for qualified industry professionals.
Get a Certification Pathway Plan from Our Compliance Team
We reply within 24 hours. Our team will map your target markets to required certifications and create an optimized testing sequence.
Book an Engineering Consultation →
References
• UL 2054 — Household and Commercial Batteries Standard (2023)
• IEC 62133-2 — Safety Requirements for Portable Sealed Secondary Cells (2023)
• FCC Part 15 — Radio Frequency Devices (2024)
• European Commission — Battery Directive 2006/66/EC (2023 revision)